How much laundry can a 20 kg industrial washing machine handle in a day? Drum capacity alone cannot answer that. The programme, textiles, drying stage and working hours all affect output. Start with the workload, then compare equipment prices.

Test your scenario

Change the daily workload.
See the difference immediately.

These are example figures. Enter your own site data.

Cycle time and planning factor

Include the selected programme, loading and unloading. The factor represents the working time allowance you choose for breaks and uneven loads.

WASHING STAGE CALCULATION3machines in this calculated scenario
Required throughput37.5 kg/h
Calculated output per machine16 kg/h
Demand37.5
Calculated washing capacity48

20 kg · 60 min cycle · 80% factor

This is not a recommended equipment package. It is a simplified calculation of the washing stage only. Drying, finishing, textile properties, peak loads and spare capacity require separate checks.

How is it calculated?

Hourly demand = daily dry textile weight ÷ working hours.
Output per machine = load × (60 ÷ cycle minutes) × factor.
Machine count = hourly demand ÷ output per machine, rounded up.

First identify what you wash and how much

Hotel bed linen, SPA towels, restaurant tablecloths and workwear need different processes. Specify the textiles, daily dry weight, peak workload and shift length. If you already have equipment, explain where queues build up.

Worked example: 300 kg over 8 hours

Processing 300 kg of dry textiles over 8 hours requires average throughput of 37.5 kg per hour. This is not a machine specification. Equipment counts depend on washing, unloading, drying, sorting and finishing times.

Explore the equipment

Select equipment in the image.

Three stages of one coordinated workflow.

Illustrative laundry: washers on the left, dryers in the centre, finishing on the right
Illustrative interior
01 / Start of the process

Washing and extraction

Choose for the textiles and programme, not just drum capacity. Ask about residual moisture after extraction.

  • Full cycle duration
  • Working load and programmes
  • Water, electricity and drainage

What can an equipment package include?

StageEquipmentKey selection question
Washing and extractionIndustrial washer-extractorWhat load suits the textiles and programme?
DryingIndustrial tumble dryerCan it handle the washed load within the available time?
FinishingIroning table or suitable flatwork ironerWhat process suits towels, bed linen, tablecloths and clothing?
Dosing and waterChemical dosing and water treatment where requiredWhat are the water quality and machine requirements?
Internal handlingTrolleys, sorting table and shelvingHow will dirty and clean textile flows be arranged?

Not every project needs all these items. If drying is the bottleneck in an existing laundry, the enquiry may focus on a suitable dryer and its installation requirements.

Plan washing and drying together

Matching the rated loads of a washer and dryer is not enough. Ask for wash and drying cycles for the same textiles, residual moisture after extraction and the operating schedule. Faster washing helps only if the next stages can handle the output.

This applies to both hotel laundries and independent services handling different customers. The goal is a coordinated package for the planned workload, rather than the largest machine.

Check the premises before ordering

Include a site plan and utility details: electrical supply, available power, water, drainage and ventilation. Electric, steam and other heating options must be checked against the specific machine. Allow for dryer exhaust, equipment placement and maintenance access.

Check doorway access and the route to the installation area separately. Request packed dimensions and gross weight as well as the machine dimensions.

How should you compare two quotations?

The same rated capacity can come with different configurations. Compare heating, electrical requirements, controls, dosing and included parts alongside price. Check spares, technical documents, warranty terms and commissioning support separately.

Separate equipment, domestic transport in China, international freight and destination clearance. An item or service included in one quotation may be an extra in another.

How to prepare an enquiry for TEAM A→Z

Send your business type, daily laundry volume, textiles, working hours, site plan and utilities. Include the budget and destination city. Add photos or models of equipment you have in mind if available.

TEAM A→Z helps find suppliers in China, compare quotations and configurations, and arrange inspection and logistics. Send an enquiry for a new laundry or to expand your existing workflow.

**Let’s plan equipment for your laundry.**

Send your daily workload and site details.

Send an enquiry →

Planning references

Industrial laundry equipment catalogue